Asphalt paving crew on Buffalo Drive. First, the asphalt crew saw cut old/damaged asphalt, then removed the old asphalt and hauled it away. The old asphalt was sent to the asphalt plant to be recycled, and new asphalt was picked up and sent out to the job. While that was happening the asphalt crew prepares the subbase. When the new asphalt arrived, it was dumped into the asphalt paver and paving was started. The New asphalt was paved in two lifts.